- Feed monitoring carried out for the existing heating until 07.01.22.
- Feed monitoring carried out for the existing горячей воды до 07.01.22г.
Heating and hot water service provider KP-KTE – Коммунальное предприятие “Киевтеплоэнерго”
Month | Show | Kvt | Sum | Kw* | Sum* | Avg | |
01.07.2022 | 15847 | 72 | 120,96 | 72 | 120,96 | 72 | Explanation
|
02.06.2022 | 15775 | 155 | 260,40 | 81 | 136,08 | ||
01.05.2022 | 15620 | 279 | 468,72 | 81 | 136,08 | ||
01.04.2022 | 15341 | 351 | 589,68 | 81 | 136,08 | ||
05.03.2022 | 14990 | 84 | 141,12 | 81 | 136,08 | 84 | |
05.02.2022 | 14906 | 114 | 191,52 | 81 | 136,08 | ||
01.01.2022 | 14792 | 123 | 206,64 | 81 | 136,08 | ||
01.12.2021 | 14669 | 121 | 203,28 | 81 | 136,08 | ||
01.11.2021 | 14548 | 148 | 248,64 | 81 | 136,08 | ||
01.10.2021 | 14400 | 102 | 171,36 | 81 | 136,08 | ||
01.09.2021 | 14298 | 114 | 191,52 | 81 | 136,08 | ||
01.08.2021 | 14184 | 105 | 176,40 | 81 | 136,08 | ||
01.07.2021 | 14079 | 70 | 117,60 | 70 | 136,08 | 70 | |
01.06.2021 | 14009 | 88 | 147,84 | 81 | 136,08 | 88 | |
01.05.2021 | 13921 | 95 | 159,60 | 81 | 136,08 | 95 | |
01.04.2021 | 13826 | 77 | 129,36 | 77 | 129,36 | 77 | |
2098 | 3524,64 | 1283 | 2163,84 | 486 | |||
(72+84+70+88+95+77)=486/6=81 | Lesion | 815 | 1360,80 | Avg |
m-4k4 – Actual and established indicators of heating supply and hot water: | |||||||||||||
|
|||||||||||||
m-4k4 gvs – 14.07.22 13:00 – | Note: No hot water (View monitoring for 2021.)
|
||||||||||||
m-4k4 gvs – 09.05.22 – 17:30 03.06.22 | Note: No hot water | ||||||||||||
m-4k4-11.04.22-12.04.22 |
Note |
||||||||||||
m-4k4-09.04.22-10.04.22 |
Note |
||||||||||||
m-4k4-09.04.22-10.04.22 |
Note |
||||||||||||
m-4k4-04.04.22-05.04.22 |
Note |
||||||||||||
m-4k4-04.04.22-05.04.22 |
Note |
||||||||||||
m-4k4-28.03.22-29.03.22 |
Note |
||||||||||||
m-4k4-26.03.22-27.03.22 |
Note |
||||||||||||
m-4k4-23.03.22-26.03.22 |
Note |
||||||||||||
m-4k4-22.03.22-20.03.22 |
Note |
||||||||||||
m-4k4-19.03.22-17.03.22 |
Note |
||||||||||||
m-4k4-16.03.22-15.03.22 |
Note |
||||||||||||
m-4k4-14.03.22 |
Note |
||||||||||||
m-4k4-13.03.22-11.03.22 |
Note |
||||||||||||
m-4k4-06.03.22-28.02.22 |
Note |
||||||||||||
m-4k4-27.02.22 |
Note |
||||||||||||
m-4k4-26.02.22 |
Note |
||||||||||||
m-4k4-25.02.22 |
Note |
||||||||||||
m-4k4-24.02.22 |
Note |
||||||||||||
m-4k4-23.02.22 |
Note |
||||||||||||
m-4k4-220222 |
Note |
||||||||||||
m-4k4-210222 |
Note |
||||||||||||
m-4k4 onp 20.02.22 |
Note |
||||||||||||
m-4k4-18-19.02.2021 |
Note |
||||||||||||
m-4k4-17.02.2022 |
impurity |
||||||||||||
m-4k4-17.02.2022 |
Note |
||||||||||||
m-4k4 onp – 20.01.22 |
Note: |
||||||||||||
m-4k4 onp – 19.01.22 |
Note: |
||||||||||||
m-4k4 onp – 18.01.22 |
Note: |
||||||||||||
m-4k4 onp – 16.01.22r |
Note:
|
||||||||||||
m-4k4 onp – 15.01.22r |
Note: |
||||||||||||
m-4k4 gvs – 14.01.22r. |
|
||||||||||||
m-4k4 onp – 14.01.22r |
Note: |
||||||||||||
m-4k4 onp – 13.01.22r. |
Note: |
||||||||||||
m-4k4 onp – 12.01.22r. |
Note:
|
||||||||||||
m-4k4 gvs – 07:36 12.01.22r.
p |
Note: Photo fixation m-4k4 gvs - 07:36 12.01.22 produced after the cooled water was drained into the sewerage system in the pipeline from the hot water supply meter of the apartment to the water shut-off valve installed on the sink in the bathroom. After draining the cooled water into the sewer without stopping the water supply, installed in the sink 1 liter container with thermometer, then the drain hole in the sink is closed and shut-off valve is fully open, after filling the sink to the overflow holes, the water shut-off valve is closed, photo taken, after expiration 2 min taken a second photo m-4k4 gvs 07:38 12.01.22. This monitoring carried out for the existing third версии получения неправомерной выгоды, carried out for the existing available двух первой версии m-4k4 carried out for the existing 07:28 12.01.22, are given below, these versions are associated with obtaining illegal benefits carried out for the existing. Разъяснения в публикации zнсэ120122but (in work)
|
||||||||||||
m-4k4 onp – 07:28 12.01.22r. |
Note: m-4k4 onp – 09:06 12.01.22 carried out for the existing the second version of obtaining undue benefit, carried out for the existing carried out for the existing первой версии m-4k4 carried out for the existing 07:28 12.01.22, given below, these versions are associated with obtaining illegal benefits carried out for the existing. Clarifications в публикации zнсэ120122but (in work) |
||||||||||||
m-4k4 onp – 07:57 10.01.22r. |
Note: |
||||||||||||
m-4k4 gvs
p |
Note: |
||||||||||||
m-4k4 onp p |
Note: |
||||||||||||
m-4k4 gvs pZU About drinking water, drinking water supply and drainage STATE SANITATION STANDARDS AND RULES “Hygienic requirements for drinking water, intended for consumption human” (ГCанПиН 2.2.4-171-10) |
Notes (edit): Resolution of the Cabinet of Ministers of 11 December 2019. № 1182 Retrieving: 6. Hot water quality parameters must meet the requirements state sanitary norms and rules for drinking water. The hot water temperature is not lower than 50 ° C and not higher than 75 ° C at the border of the intra-house systems of an apartment building and engineering systems of the consumer's premises and not lower than 55 ° C and not higher than 75 ° C on the border of centralized engineering- technical supply systems services of the contractor and intra-building systems of an apartment buildingand.
SANITATION RULES Документ n0005400-88, in force, поточна редакція — Adoption від 15.11.1988 Retrieving: 1.7. The temperature of hot water at the points of draw-off independently
от применяемой системы теплоснабжения должна быть не ниже 60 city. With and without 75 city. FROM. Note. For hot water supply systems made of galvanized pipes with a closed heat supply system is allowed to have water temperature not less 50 city. C and no higher 60 city. FROM. In these conditions after repair work or elimination of emergency situations in the systems, it is necessary to maintain the temperature at the level 75 city. From within 48 hours.
|
||||||||||||
m-4k4 onp |
Notes (edit): |
||||||||||||
Notes (edit): |
|||||||||||||
m-4k4 onp |
Notes (edit): |
||||||||||||
m-4k4 gvs |
Notes (edit):
|
3 comments for “Мониторинг м-4к4 с 07.01.22 ”