u7-Hot water monitoring

About navigation through the text of pages of the ChAESV portal sites

By month 2023-2024

Monitoring of hot water supply and thermal power plants – month- year-

GVS – Hot water- supply, TPP – Heat power supply (Heating)

until 2023 -07-2023- -08-2023- 09-2023 -10-2023- -to 15.112023- – c 15.112023- -12-2023-

.

 

Additional Information service-related hot water

toc- Towel dryer measured by sensor installed at the pipeline inlet to the bathroom, maximally protected from the influence of the temperature of the atmosphere of the room.

toc Полотенца осушителя и горячей воды находятся в корреляционной зависимости равной 4,5 degrees.

On the basis of the above to c hot water does not exceed 42,7about + 4,5about = 47,2about

Из за отдачи тепла горячей воды сантехническим элементам и сливом горячей воды в канализацию при замере, measurement through a temperature sensor осуществляется – when measuring to c correlation additive is used – (Kd=4.50) to the sensor readings of the p / dehumidifier -(PS) Then: Hot water temperature – (GV) equal – GV=PS + cd. Hot water sensor is disabled, in the future with 13.11.2023 r. место расположения индикатора GVS будит использовано для отображать показание GV which is equal to PS + cd.
Monitoring of hot water supply sq. 4 house 40b
.

 

Monitoring 01.11.2023 – 30.11.2023

Explanation of temperature measurements: Hot water; Heating.

21;00 11.11.2023 on 31 hot water is on daily, heating see above – monitoring for 11.11.2023r.
c 18:30 11.10.2023 r. by 10.11.2023 r. 30-e day off hot water, no heating since the day it was turned on.
.
.

 

Monitoring 01.10.2023 – 31.10.2023

Explanation of temperature measurements: Hot water; Heating.

t average since 10.2023: = t house structures
c 18:30 11.10.2023 r. by 31.10.2023 r. Off hot water, Нет ГВС 20-е сутки

 

  • 10:08, 12.10.2023r, – Dispatcher of the UZHKH of the Svyatoshyn district, r. Kiev, tel: 044-290-92-70 “Recording
  • 10:17, 12.10.2023r. – Dispatcher UZKH Mr. Kiev, tel: 044-500-15-57 – “Recording“.
  • 10:27, 12.10.2023 r. – DispatcherConcierge houses 40b” – ГВС нет until 13.10.2023. due to prevention.
  • Гражданин AGM на основание какого approved in the condominium of the document “Prevention”, почему нет объявлений и предупреждений в установленных в НПА местах и сроках?

t average for 10/01/2023: 40,53

t average for 10/02/2023: 40,55

.

 

Monitoring 01.09.2023 – 30.09.2023

Explanation of temperature measurements

t average for 09.2023.: (43,8+43,1+43,3+41,3+42,2+41,75+40,56+40,13+40,44+40,5+40,3+40,5+40,95+34,1+40,47+34,6+40,6+40,78)/18 = 42,52about
t among = 40,78

t among = 40,60

18.09.2023 13:40, hot water turned off, 18.09.2023 19:00, включена горячая вода

t among = 40,47

t among = 34,60

16.09.2023 24:10, hot water turned off16.09.2023 15:45, turned on hot water
t among = 34,10

t among = 40,50

t among = 40,95

t among = 40,50

t among = 40,30

t among = 40,44

t among = 40,56

t among = 40,13

t among = 42,20

t among = 41,75

t among = 43,30

t among = 41,9

t among = 43,80

t among = 43,1

.

 

Monitoring 01.08.2023 – 31.08.2023

Explanation of temperature measurements

15.08.2023 15:30, hot water turned off 31.08.2023 17:00, включена горячая вода (no hot water supply 16 days)
17:00, 31.08.2023 A.G. Miller deigned to include DHW in the house 40b, in house 40a hot water supply is on 16:00, 30.08.2023, heat point shared by two houses. YES. Shmihal, V.V. Klitschko, V.V. Grigorenko as an accident on the pipeline of housing and communal services No. 7 duration 15 days, and 10 summer DHW temperature regime below 50 degrees, беспорядочные отключения ГВСcorresponds NLA of the State of Ukraine ???
No hot water 29.08.2023, 09:53 обращение . на тел.044-500-15-57, rep. operator Hope – asked a question – why is there no hot water in the house at 40b st.. Klavdievskaya. Reply. pipeline accident, без воды 58 houses, установлен время на ремонт до 19:00, 29.08.2023
Тепло пункт на два дома 40a и 40б в доме 40а в 20:37 21.08.2023 появились первые признаки ржавой горячей воды, t which is approximately 30about. далее горячая вода была отключена В дome 40b hot water did not turn on at all its presence, температура и другой правовой порядок в доме depends on desire монарха А.Г. Miller. Эту attacking monarchy in house 40b it is time to stop due to violation of the legal acts of Ukraine, осуществить это путём передачи дома 40б в управление полноценному Управителю.
No hot water on 19.08.2023 r. – 8:00 dispatcher information 044-500-1577 “Svetlana”, время на ремонт в районе территории ЖКУ №7 продлено на новый срок до 20:00, 21.08.2023r. В связи с полученным ответом, more accurate information requested repair coordinates – Street name, number of the nearest house from the place of the accident, “Svetka” blacked out. Это заявку принял другой диспетчер при повторном звонке на 044-500-1577 Only 21.08.2023. information was received on a new request, that work is being carried out in the Heat Chamber at Bulakhovsky Xx, ГВС будет подана 21.08.2023, 20:00
Hot water off 15.08.2023 of the year 13:30 to 20:00, 18.08.2023 according to dispatcher 044-500-1557,. the reason for the pipeline rupture on the territory of residential complex No. 7, 33 дома без горячей воды. According to the concierge (“Dispatcher” Houses40b??? st. Klavdievskaya) water is turned off until 23.08.2023. There are no ads in official установленных местах для их размещения.
.

 

Monitoring 01.07.2023 – 31.07.2023

Explanation of temperature measurements

.

.

Monitoring with 28.06.2020 by 05.01.2-22

u7 – Monitoring hot water (MGV) (The norm is set from 50 ° to 75 °, Average t ° – normal service = 62.5 °)
Current GW parameters mone month. Disconnecting DHW
Total house expenses and GW costs per month
 

Date

 

Time

T = C °

fact

A photo

m-4k4

 

Off

 

On

Consumption

obsh.doma m3

 

sq. houses m3

General

sum.grn

 

Debtors

05.01.22 10:04 50,5 m-4k4
19.12.21 8:45 49 m-4k4
05.12.21 10:36 49 m-4k4
10.11.21 9:19 49 Rusty
08.11.21 7:57 49 Rusty
29.10.21 7:34 49,5 Rusty
27.10.21 8:27 49 Rusty
06.10.21 10:26 49 A photo Note
03.10.21 9:00 9:00
25.09.21 15:00 No hot water
19.09.21 10:57 53 Rusty
15.09.21 8:44 47 Rusty
14.09.21 9:16 51 A photo
11.09.21 8:30
09.09.21 16:00 No hot water
09:09.21 48 Rusty
07.09.21 09:00
01.09.21 17:30
No hot water
29.08.21 09:57 47 Rusty
27.07.21 by 27.08.21 No hot water
12.07.21 by 26.07.21 Disconnected Kievteploenergo for hydraulic test.
09.07.21 06:39

07:39

08:39

49

50

48

Rusty

Rusty

Rusty

03.06.21 11:19 48 Rusty
01.07.21 12:00 00,00 12:00 16:30 .incl. 02.06.21
31.05.21 10:54 34 A photo
27.05.21 09:30 A photo
18.05.21 10:53 33,5 A photo
13.05.21 07:58 32 A photo
06.05.21 10:23 35 A photo
03.05.21 10:30 32 A photo
27.04.21 09:32 35 A photo
23.04.21 09:34 39 A photo
22.04.21 10:27 42 Rusty
21,04.21 No water No water Rusty, Rusty 20:00
20.04.21 No water No water 15:00 19:00
29.03.21 11:10 43 A photo
20.03.2021 12:35 43 Rusty
19.03.2021 10:00 12:00
14.03.2021 10:21 49 A photo
04.03.2021 10:31 50 A photo
26.02.2021 08:47 49 A photo
22.02.2021 11:47 54 Rusty 13:00 to the address-
ep: 1(3time),2,3 22.02.2021 link to u7
13.02.2021 10:55 53 Rusty
08.02.2021 10:27 54 Rusty HVS fot etal ep CT 16:19 08.02.2021 link to u7
06.02.2021 06:00 0 06.00 16:00 06.02.2021 incl
05.02.2021 08:51 53 Rusty
.30.01.2021 17:41 57 Rusty
28.01.2021 08.57 57 Rusty
26.01.2021 12:11 54 Rusty
25.01.2021 22:30 0 22:30 10:30 26.01.2021 incl ep CT 8:30 26.01.2021 link to u7
21.01.2021 10:50 46 Rusty
.19.01.2021 4:00 0 4:00 11:00
18.01.2021 17:45 65 Sl.rusty
05.01.2021 11:19 52 Miniature
30.12.2020 22:34 0 reference
28.12.2020 8:51 57 Sl.rusty
27.12.2020 06.23 42 Rusty Note
19.12.2020 11:20 52 Sl.ržav
13.12.2020 10;00 43 Rusty
07.12.2020 10:00 47 Sl.ržav
06.12.2020 10:00 45 Sl.ržavč
30.11.2020 10:00 44 Rusty
26.11.2020 10:00 44 Rusty
22.11.2020 10:00 41 Rusty
16.11.2020
10:00
43
Rusty
12.11.2020 10:00 44
28.05.2020 21:35 25 Note

 

0

Publication author

this was done in order to comply with the numbering of apartments by floors and their communications for the supply of utilities in accordance with the project documentation for building 40b 3 years

Anatolian

0
Comments: 0Public: 25Registration: 08-11-2020

16 comments for “u7-Hot water monitoring

  1. and mark their completion: OSBB K40b — OSMD
  2. and mark their completion: OSBB K40b — OSMD K40b
  3. and mark their completion: z18.01.21срда-y28.01.21 – OSMD K40b
  4. and mark their completion: z18012021srd for c26f8q1p1 – OSMD K40b
  5. and mark their completion: u1-Monitoring Management – OSMD K40b
  6. and mark their completion: u7-More information – OSMD K40b
  7. and mark their completion: zvai261022zva-shda-joa-plv – OSMD K40b
  8. and mark their completion: MSBS-TES-GVS – OSMD K40b
  9. and mark their completion: f1 – OSMD K40b
  10. and mark their completion: 2024 – OSMD K40b
  11. and mark their completion: ш1 – TAUG NGO project of planet Earth

Leave a Reply

Operation of the house and its systems. Operation of the house and its systems *